praveen raj
NUMERICALS ON AGC _ GOVERNOR / KTU/ POWER SYSTEM ANALYSIS
10:14
praveen raj
NUMERICALS ON _TWO AREA SYSTEM_ AGC / KTU / POWER SYSTEM ANALYSIS
15:48
praveen raj
TWO AREA SYSTEM -AUTOMATIC GENERATION CONTROL / KTU/ POWER SYSTEM ANALYSIS
19:46
praveen raj
AUTOMATIC GENERATION CONTROL - PART 2 /KTU/ POWER SYSTEM ANALYSIS
34:54
praveen raj
AUTOMATIC GENERATION CONTROL- PART1 /KTU/ POWER SYSTEM ANALYSIS
8:13
praveen raj
NECESSITY OF SLACK BUS / KTU/ POWER SYSTEM ANALYSIS
8:43
praveen raj
LOAD FLOW EQUATION / POWER FLOW EQUATION/ KTU/ POWER SYSTEM ANALYSIS
13:39
praveen raj
GAUSS SEIDEL LOAD FLOW SOLUTION(PROBLEM 3)WITH REACTIVE POWER CONSTRAINT/ KTU/ POWER SYSTEM ANALYSIS
43:27
praveen raj
GAUSS SEIDEL LOAD FLOW PROBLEM- 1 / KTU/ POWER SYSTEM ANALYSIS
31:03
praveen raj
GAUSS-SEIDEL METHOD - LOAD FLOW PROBLEM-2 / KTU/ POWER SYSTEM ANALYSIS
30:03
praveen raj
POWER INVARIANCE IN SYMMETRICAL COMPONENTS /KTU / POWER SYSTEM ANALYSIS
14:24
praveen raj
FAULT CURRENT CALCULATION IN SYMMETRICAL THREE PHASE FAULT/ KTU/ POWER SYSTEM ANALYSIS
17:35
praveen raj
PER UNIT REACTANCE - HOW TO CHANGE BASE VALUE /KTU/ POWER SYSTEM ANALYSIS
9:28
praveen raj
SHORT CIRCUIT MVA / FAULT MVA WITH CURRENT LIMITING REACTANCE / KTU/ POWER SYSTEM ANALYSIS
14:20
praveen raj
PER UNIT REACTANCE OF TRANSFORMER- NUMERICALS / KTU/ POWER SYSTEM ANALYSIS
5:12
praveen raj
LINE TO LINE FAULT - NUMERICAL PROBLEM/ KTU/POWER SYSTEM ANALYSIS
27:18
praveen raj
THREE PHASE TO GROUND FAULT / SYMMETRICAL FAULT- NUMERICAL PROBLEM /KTU/POWER SYSTEM ANALYSIS
25:12
praveen raj
SINGLE LINE TO GROUND FAULT / NUMERICAL PROBLEM /KTU/ POWER SYSTEM ANALYSIS
23:58
praveen raj
DOUBLE LINE TO GROUND FAULT /KTU/POWER SYSTEM ANALYSIS
19:56
praveen raj
LINE TO LINE FAULT ANALYSIS / KTU/ POWER SYSTEM ANALYSIS
17:33
praveen raj
SINGLE LINE TO GROUND FAULT ANALYSIS / KTU/ POWER SYSTEM ANALYSIS
20:18
praveen raj
POSITIVE, NEGATIVE, ZERO SEQUENCE REACTANCE DIAGRAM / KTU/ POWER SYSTEM ANALYSIS
10:40
praveen raj
THREE PHASE TO SYMMETRICAL COMPONENTS - NUMERICAL PROBLEM / KTU/ POWER SYSTEM ANALYSIS
13:40
praveen raj
Sequence Networks of Generator, Transformer, Transmission Line
28:18
praveen raj
SYMMETRICAL COMPONENT TRANSFORMATION / KTU/ POWER SYSTEM ANALYSIS
22:12
praveen raj
SYMMETRICAL THREE PHASE FAULT- NUMERICAL PROBLEM /KTU/ POWER SYSTEM ANALYSIS
21:08
praveen raj
REACTANCE DIAGRAM WITH PER UNIT VALUES / KTU/ POWER SYSTEM ANALYSIS
22:05
praveen raj
Numerical problem on Corona in the Transmission Line (PGTP) Praveen Raj R S
17:25
praveen raj
CORONA in the Transmission lines
14:57
praveen raj
Numerical problem on High voltage Transmission (PGTP) Praveen Raj R S
4:43
praveen raj
Economic Transmission Voltage (PGTP) Praveen Raj R S
7:38
praveen raj
High Voltage Transmission-Advantages and Limitations (PGTP) Praveen Raj R S
10:32
praveen raj
Numerical Problem on Kelvin's law (PGTP) Praveen raj R S
7:26
praveen raj
Economic size of Conductor- Kelvin's Law (PGTP) Praveen Raj R S
10:19
praveen raj
Numerical Problem-2 on Conversion of Transmission systems (PGTP) Praveen Raj R S
6:40
praveen raj
Numerical Problem-1 on Conversion of Transmission Systems (PGTP) Praveen Raj R S
6:00
praveen raj
Volume of conductor for Different Types of Transmissions (PGTP) Praveen Raj R S
12:08
praveen raj
Numerical Problem-3 on SAG in the Transmission Lines (PGTP) Praveen Raj R S
13:39
praveen raj
Numerical Problem-2 on SAG in the Transmission Lines (PGTP) Praveen Raj R S
12:15
praveen raj
Numerical Problem-1 on SAG in the Transmission Lines (PGTP) Praveen Raj R S
4:03
praveen raj
SAG in the Transmission Lines (PGTP) Praveen Raj R S
21:54
praveen raj
Numerical Problem ABCD constants Nominal T
11:20
praveen raj
ABCD constants Nominal Pi
8:57
praveen raj
ABCD constants Nominal T
7:05
praveen raj
Modelling of Long Transmission Lines. RIGOROUS METHOD (PGTP) Praveen Raj R S
19:59
praveen raj
Numerical Problem on Nominal Pi Method- Medium Transmission Lines (PGTP) Praveen Raj R S
19:34
praveen raj
Nominal Pi Method - Modelling of Medium Transmission Lines (PGTP) Praveen raj RS
11:03
praveen raj
Numerical Problem on Nominal T method -Medium Transmission Lines (PGTP) Praveen Raj R S
19:55
praveen raj
Nominal T Method - Modelling of Transmission Lines (PGTP) Praveen Raj RS
12:48
praveen raj
Numerical problem on Short transmission lines (PGTP) - Praveen Raj R S
12:37
praveen raj
Numerical problem on Economics of PF Improvement (PGTP) Praveen Raj R S
15:31
praveen raj
Numerical Problem on PF Improvement 3 Phase load (PGTP)- Praveen Raj RS
17:48
praveen raj
Modelling of Short Transmission Lines (PGTP-KTU) - Praveen Raj RS.
16:30
praveen raj
Capacitance of Three Phase Transmission Lines (KTU-PGTP)- Praveen Raj RS.
19:27
praveen raj
Effect of Earth on the Capacitance of Overhead Transmission Lines (PGTP-KTU) -Praveen Raj RS.
15:08
praveen raj
Capacitance of Single Phase Overhead Transmission Line (PGTP-KTU)-Praveen Raj RS.
9:27
praveen raj
Numerical Problem on Inductance of Double circuit Transmission line (PGTP-KTU) -Praveen Raj RS.
19:17
praveen raj
Numerical Problem on Inductance of Three Phase Lines (PGTP S5 EE KTU) Praveen Raj RS
12:03
praveen raj
Inductance of Double Circuit Line (PGTP) Power Generation Transmission Protection- Praveen Raj RS
29:06
praveen raj
Proximity Effect of Transmission line (PGTP)Power Generation Transmission Protection- Praveen Raj RS
6:30
praveen raj
Skin Effect (PGTP)- Power Generation Transmission Protection - Praveen Raj RS
6:32
praveen raj
Inductance of Three Phase Lines,Transposition PGTP (Power Generation Protection)-Praveen Raj RS
21:56
praveen raj
Inductance of Composite Conductors (PGTP) Power Generation Transmission Protection - Praveen Raj RS
21:59
praveen raj
Low Power Facotor -Causes,disadvantges(PGTP) Power Generation Transmission Protection-Praveen Raj RS
23:05
praveen raj
Design of Capacitor Bank to Improve Power Factor (PGTP) Power Generation Transmission-Praveen Raj RS
17:03
praveen raj
Inductance of Single Phase Two Wire Line (PGTP)Power Generation Transmision Protecion Praveen Raj RS
37:00
praveen raj
Power Factor improvement methods- Praveen Raj RS
13:27