Montgomery, Alabama Capitol Inn Demolition 10/21/2016
During the demolition of second and third floors, the excavator fell through the first floor ceiling into the tavern below.
With the aid of a tow truck and cables, the excavator operator managed to rotate the machine and use its arm to push the machine while the treads & cables pulled it out of the hole it was stuck in.
コメント